CDA dk750 Spezifikationen Seite 28

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 36
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 27
28
Installation "A" between Existing Side Cabinets
(560 or 600 mm GAP)
(gs. 24, 25, 26, 28)
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Figs. 25 or 28).
Fig. 28 only - prepare 2 wood uprights A (width 20-
50 mm, thickness 18 mm, length 650 mm); mount the
2 wood uprights A to the cabinet walls as indicated in
gure.
Build in the double oven making it slide on the metal
supports “B”.
Installation "B" between Side Cabinets by
Removing Provious Housing (gs. 27, 28)
– Remove previous housing.
Mount the 2 (two) metal supports B (supplied with the
appliance in a separate kit) as indicated in Fig. 28.
Prepare 2 wood uprights A (width 20-50 mm, thickness
18 mm, length 650 mm); mount the 2 wood uprights A
to the cabinet walls as indicated in gure.
Build in the double oven making it slide on the metal
supports “B”.
544
20
538
718
595
42
560
B
WARNING !
VERY IMPORTANT
The underside of the
cabinet shall be
opened to allow
correct air circulation.
720 min
(
*
)
B
Support base
570 min
Fig. 25
(*) Measure calculated from the
underneath of the worktop to the
top support base of the B supports.
560 mm Gap
560 mm Gap
Installation “A
Fig. 24
Seitenansicht 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Kommentare zu diesen Handbüchern

Keine Kommentare