CDA HG7300 Wartungshandbuch Seite 20

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 19
20
Conversion to Natural Gas or LPG
Replacing the Burner Injectors
If the NATURAL GAS/LPG conversion kit is not supplied with the appliance this kit can be purchased by contacting
the After-Sales Service.
Choose the injectors to be replaced according to the table below.
The injector diameter, expressed in hundredths of a millimetre, is marked on the injector body.
To replace the injectors proceed as follows:
– Remove the pan supports, the burner caps and flame speaders.
Using a wrench, substitute the nozzle injectors “J” (Figs. 19 - 20) with those most suitable for the kind of gas for
which it is to be used.
The burners are made in such a way so as not to require regulation of the primary air.
J
J
Triple Ring
burner
Auxiliary,
Semi-Rapid
and Rapid
burners
Fig. 19 Fig. 20
Table for the Choice of the Injectors
Cat: II 2H 3+
Burners Nominal
Power
kW
Reduced
Power
kW
G30 - 28-30 mbar
G31 - 37 mbar
G20 - 20 mbar
Ø Injector
1/100 mm
Ø Injector
1/100 mm
Auxiliary (A) 1,00 0,40 50 77
Semi-Rapid (SR) 1,75 0,45 66 101
Rapid (R) 3,00 0,75 87 129
Triple Ring (TR) 3,50 1,50 93 135
Seitenansicht 19
1 2 ... 15 16 17 18 19 20 21 22 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare