© 1994 – 2011 Fieldbus Foundation
28
• Client
Jindal Steel West(JSW) Limited, are Specialized manufacturer and supplier of Steel
Products.
JSW group with turnover of 7 BUSD has diversified interests in Steel, Energy, Minerals
and mining, Aluminium, Infrastructure and logistics, Cement and Information Technology.
• Application
• Complete automation of Sinter Plant.
• .
• Site
• JSW Steel Ltd, Thoranagallu
• Scope
JSW Steel Ltd chose ABB System 800xA as DCS package for the Sinter Plant
Automation.
The ABB Scope of supply includes 2 controllers, around 8,000 I/Os, 7 operator workplace,
Redundant aspect & connectivity servers, 400 devices on Profibus and 80 devices on FF.
• In Operation
• June- 2006.
JSW,India
Sinter Plant
AB
B
Kommentare zu diesen Handbüchern